SCAFFOLD ALARMS QUOTATION - STEP 1:
Microwave Beam Scaffold Alarm System
Please select the number of weeks and the number of scaffold
elevations required:
* Discounts for long-term contracts
* Discounts for multi-site contracts
| Elevations/Sides: |
Elevation ie front, side, rear side of building |
|
5 Scaffold boards wide |
|
1st Lift of scaffold or 1st Floor level of building |
| Alarm detection
equipment: |
1 Pair 50m external microwave beam detector |
|